Skip to Content

Oracle 1z0-344: JD Edwards EnterpriseOne Subsystem Jobs Functionality & Statements

Learn the truth about JD Edwards EnterpriseOne subsystem jobs functionality. Discover which two statements are accurate in this comprehensive guide.

Table of Contents

Question

Which two statements are true about JD Edwards EnterpriseOne subsystem jobs functionality? (Choose two.)

A. Running a report multiple times as a subsystem job overwrites the PDF output file after each execution and creates only one PDF output at the end of the subsystem job execution.
B. There is no difference between executing a subsystem job on the client and enterprise servers.
C. You cannot control the limit for simultaneous execution of subsystem jobs per report.
D. Short duration jobs are an ideal fit for running as subsystem jobs and they run into an infinite loop throughput the UBE logic avoiding multiple submissions of the same job.
E. There is no difference between Ending or Stopping a subsystem job as both terminates the subsystem jobs instantly.

Answer

B. There is no difference between executing a subsystem job on the client and enterprise servers.
C. You cannot control the limit for simultaneous execution of subsystem jobs per report.

Explanation

The two true statements about JD Edwards EnterpriseOne subsystem jobs functionality are:

B. There is no difference between executing a subsystem job on the client and enterprise servers.
Subsystem jobs can be executed on either the client or enterprise servers with no functional difference. The execution location does not impact the behavior or output of the subsystem job.

C. You cannot control the limit for simultaneous execution of subsystem jobs per report.
JD Edwards EnterpriseOne does not provide a built-in way to limit the number of subsystem jobs that can run concurrently for a specific report. Multiple instances of a subsystem job for the same report can execute simultaneously without restriction.

Explanations of why the other statements are false:

A is incorrect because running a report multiple times as a subsystem job creates a new, separate PDF output file for each execution. The PDF files are not overwritten.

D is false because short duration jobs are not an ideal fit for subsystem jobs and will not run in an infinite loop. Subsystem jobs are best suited for longer running processes. Each submission executes the job logic once.

E is inaccurate as there is an important difference between Ending and Stopping a subsystem job. Ending a subsystem job allows the current process to complete before terminating, while Stopping ceases execution immediately.

In summary, subsystem jobs function identically on client and enterprise servers, and do not allow controlling the simultaneous execution limit per report. The other statements about PDF output, short jobs, and termination are not correct.

Oracle 1z0-344 certification exam practice question and answer (Q&A) dump with detail explanation and reference available free, helpful to pass the Oracle 1z0-344 exam and earn Oracle 1z0-344 certification.